Office Construction

Workspace fit-outs delivered on lease dates.

Office fit-outs, meeting rooms and tenant improvements built around your lease dates, your team and your IT.

Commercial service

Fit-outs that land on the date your lease says.

Office work is schedule work. We plan demolition, mechanical, ceilings, glazing and data around your possession and move-in dates, coordinate with building management, and keep neighbouring tenants unbothered.

  • Open-plan, private office and meeting room build-outs
  • Glass partitions, doors and acoustic treatment
  • Mechanical, lighting and data infrastructure
  • Kitchenettes, reception and collaboration spaces

What's included

What an office fit-out includes.

Every project is scoped and priced before we start.

Programming

Headcount, meeting and collaboration needs turned into a plan.

Partitions & glazing

Demountable walls, glass fronts and doors installed clean.

Mechanical & lighting

HVAC zoning, ceilings and lighting balanced across the floor plate.

Data & power

Floor boxes, risers and cabling coordinated with your IT team.

Acoustics

Sound separation for meeting rooms and focus areas.

Building coordination

Landlord approvals, freight bookings and after-hours work.

How it runs

How the work runs.

Site and lease review

We read the space, the lease and the landlord requirements before anything is drawn, so the scope matches what you are actually allowed to build.

Drawings and permits

Layouts, engineering where structure moves, and the development and building permits driven through the city by us.

Fixed, itemised price

A line-by-line quote before demolition, with long-lead equipment identified and the contingency named out loud.

Build and inspections

Trades sequenced around your opening date, with every inspection booked and cleared as we go rather than at the end.

Handover and occupancy

Deficiencies cleared, occupancy permit in hand, warranties and manuals collected and passed to you.

Working to a lease date

The move-in date is the brief.

Most office fit-outs are not judged on the finishes. They are judged on whether the staff could work on the Monday they were told to. That means the schedule is built backwards from the lease commencement or the move date, and every long-lead item is ordered against it rather than when it comes up in sequence.

We also plan for the disruption around the work: if you are staying in the space while it changes, the build is phased so a department is never without a desk, a meeting room or a working network.

  • Schedule built backwards from your move-in date
  • Data, power and AV coordinated with your IT provider
  • Meeting rooms with acoustic separation that actually works
  • Phased so occupied areas keep working through the build

Common questions

Questions we get asked most.

Anything not covered here, just ask on the call.

Can we keep working while you build?

Usually yes. We hoard the active zone, run the noisy work outside core hours where the building allows it, and phase the sequence so each team moves once rather than twice. It costs a little more in programme and saves far more in disruption.

Do you handle data and AV?

We coordinate them and build the containment, backboxes and power. Cabling and equipment are usually installed by your own IT or AV provider, and we schedule them into the programme so they are not left to the last week.

How long does a fit-out take?

Six to fourteen weeks on site depending on floor area and how much of the mechanical and electrical changes. A cosmetic refresh is quick; moving walls, ductwork and sprinkler heads is what adds programme.

Can you work to a landlord allowance?

Yes, and it is worth structuring the scope around it early. We price the base build and the extras separately so you can see exactly where the allowance runs out and decide what is worth funding yourself.

Start your project