Childcare Construction

Licensing-ready daycares and learning centres.

Purpose-built childcare spaces that pass licensing the first time — safe finishes, clear sightlines and durable millwork built for daily wear.

Commercial service

Built for licensing, kids and staff — in that order.

Childcare builds live and die on regulatory detail: washroom ratios, sightlines, egress, sink placement and finish safety. We build to Alberta licensing requirements from the first drawing, and coordinate the inspections so your opening date holds.

  • Licensing-compliant layouts and washroom ratios
  • Safe, low-VOC and easy-clean finishes
  • Durable cubbies, casework and play millwork
  • Playground surfacing, fencing and site work

What's included

What a childcare build includes.

Every project is scoped and priced before we start.

Layout & licensing

Room sizes, sightlines and washroom counts planned against Alberta childcare regulations.

Safe finishes

Low-VOC paint, sealed flooring and rounded millwork chosen for scrubbing, not showrooms.

Casework & storage

Cubbies, low sinks, change stations and staff storage built to hold up to daily use.

Outdoor space

Fencing, gates, surfacing and shade structures ready for inspection.

Mechanical & acoustics

Ventilation and sound separation so rooms stay comfortable and calm.

Inspection support

We manage the trades and walkthroughs until your licence is in hand.

How it runs

How the work runs.

Site and lease review

We read the space, the lease and the landlord requirements before anything is drawn, so the scope matches what you are actually allowed to build.

Drawings and permits

Layouts, engineering where structure moves, and the development and building permits driven through the city by us.

Fixed, itemised price

A line-by-line quote before demolition, with long-lead equipment identified and the contingency named out loud.

Build and inspections

Trades sequenced around your opening date, with every inspection booked and cleared as we go rather than at the end.

Handover and occupancy

Deficiencies cleared, occupancy permit in hand, warranties and manuals collected and passed to you.

Before you sign a lease

Most childcare delays start with the space, not the build.

The single most expensive mistake in a childcare build is committing to a unit that cannot be licensed for the number of children the business plan depends on. Floor area per child, washroom counts, natural light and a compliant outdoor play space are all fixed by regulation, and no amount of clever layout invents floor area that is not there.

We will walk a space with you before you sign, work out the realistic licensed capacity, and tell you what it will cost to get there — including the things landlords rarely mention, like whether the servicing can carry the extra plumbing.

  • Licensed capacity worked out from the actual floor plan
  • Outdoor play space, fencing and surfacing assessed early
  • Washroom and sink counts checked against the age groups you plan to take
  • Ventilation, servicing and power confirmed before you commit

Common questions

Questions we get asked most.

Anything not covered here, just ask on the call.

How long does a childcare build take?

A tenant fit-out in a suitable space is typically twelve to eighteen weeks on site once permits are in hand. Permits themselves are the variable — allow six to twelve weeks for development and building permits in Calgary, and start them the day the lease is signed rather than when drawings are finished.

Do you handle the licensing inspections?

We build to Alberta childcare licensing requirements and coordinate the trades and inspections through to occupancy. The licensing application itself is yours to hold, because the licence attaches to the operator rather than the builder — but we attend the walkthroughs and fix anything raised.

Can you work around an existing daycare that is still operating?

Yes, and we do it often for expansions. The work is phased and hoarded so the operating rooms keep their exits, their ratios and their licence, and noisy or dusty work is scheduled outside operating hours.

What does a childcare fit-out cost?